Quote the whole job. Keep the margin.
Model material, machine time, labor, energy, failures, finishing, and delivery. Reconcile the quote with actual job usage instead of guessing at filament markup.
Saved on this browser
No cloud sync. Avoid saving sensitive records on a shared browser.
Illustrative starting inputs. Replace them with your own measurements and evidence.
Know what every successful job costs.
Failure allowance applies to repeatable material, energy, and machine costs. Setup, successful-job finishing, packaging, and shipping are charged once in this model.
Expected cost breakdown
USDBefore you act
- Expected reprints assume independent identical failure probability and full repeatable attempt costs. Partial failures, repeated setup labor, refunds, and correlated failures need separate adjustment.
- Target gross margin is not net profit. Taxes, financing, payment fees, customer acquisition, and unentered overhead can reduce profitability.
- Slicer import reads supported comment metadata only. It never executes G-code or uploads the model. Unsupported or ambiguous metadata is rejected.
Quote versus actual cost
| Material | $3.20 | $3.12 | -$0.08 |
| Energy | $0.16 | $0.16 | -$0.00 |
| Machine allocation | $2.00 | $1.95 | -$0.05 |
| Labor | $17.50 | $20.00 | $2.50 |
| Packaging / shipping / overhead | $10.00 | $10.00 | $0.00 |
Calculation notes & limitations
Expected attempts until one success = 1 ÷ (1 − failure probability). Repeatable material, machine, and energy costs are multiplied by this factor.
Hourly machine allocation = (purchase price − salvage) ÷ service hours + maintenance reserve. This is an allocation assumption, not a guaranteed machine lifetime.
Required quote = expected successful-job cost ÷ (1 − target margin). Actual gross margin = (quoted price − actual cost) ÷ quoted price; a zero quote has undefined margin.
The method is part of the tool.
Enter per-attempt material and machine time, measured average energy draw, explicit labor, and per-job fulfillment costs.
Apply an independent-failure allowance to repeatable costs, then divide total successful-job cost by one minus target margin.
Reconcile quoted price with actual total material, machine time, and labor across all attempts. Preserve the cost-driver variance.
Read the full methodologyEvidence before certainty.
A cost estimate is only as complete as its inputs. Slicer comments do not establish labor, failure risk, electricity draw, or a profitable selling price.
These are reference sources, not evidence that example records have been verified. Imported records retain the source links you provide.